Indian Rock (South Bay) Adopt-A-Crag: Coming Up May 20, 2017!

Join the Bay Area Climbers Coalition in partnership with Sanborn/Santa Clara County Parks department to take on some needed cleaning and maintenance around Indian Rock South Bay.  We will be cleaning up glass and trash, doing trail and rock stair maintenance, and removing graffiti.

Location:  Indian Rock is located in Saratoga.  A full description and detailed directions can be found on its Mountain Project website.  It can be confusing to find when going there the first time, so be sure to check a map before you head out.  Please note that Skyline is currently closed south of Indian Rock and Castle Rock.

We have found the easiest way to get to Indian Rock is the following:

  1. From CA-85, exit Saratoga Ave and head west
  2. Continue on Saratoga Ave; it will become CA State Route 9
  3. Follow CA State Route 9 up the mountain. The first stop sign you get to is CA-35; turn left.
  4. Follow CA-35 for about 2.5 miles.  You will see Castle Rock State Park on your right; go about 100 feet further, and you will see Indian Rock on your left.

Date:  May 20, 2017
Time:  10:00 A.M. – 1:00 P.M.
How To Join:  Sign up on Eventbrite!

Logistics

Food – Delicious lunch will be provided as well as snacks to keep you fueled for the day!

Water – We will have water available. If you have a water bottle, please feel free to bring it with you.

Tools – We will provide tools and gloves–please be sure to wear long pants and close-toed shoes.

Climbing – The plan is to end the event around 1 pm to allow enough time for everyone to go climbing together!  Indian Rock is one of the premier Bay Area crags with amazing bouldering, top rope, and sport climbs. Many climbers know it as home to some of the best boulder problems in the greater Castle Rock/Sanborn County area. Feel free to bring your own gear for some post-event crushing at Castle Rock State Park, Indian Rock, or another of the many crags in the area.

We greatly appreciate the support from Planet Granite-Sunnyvale and Access Fund for this Adopt-A-Crag!

Glen Park Adopt-A-Crag: Coming Up May 13, 2017!

Join the Bay Area Climbers Coalition to take on some work in beautiful Glen Canyon, nestled in the heart of San Francisco’s world-famous hills! Activities will include cleaning up glass and trash, clearing paths and walkways, trail repair, and graffiti removal.

Location: Glen Canyon Park is located in the Glen Park neighborhood of San Francisco, a pleasant 10 minutes walk on flat ground from the Glen Park BART station. TheCrag.com provides a great overview and directions. The park is a popular spot on weekends, so parking can be challenging; carpooling or public transit is recommended if at all possible. We’ll be meeting in the middle of the park, at the northern end of the dirt road that runs alongside Islais Creek, just across from the Silvertree camp / Glen Ridge pre-school building.
Date: May 13, 2017
Time: 10:00 AM to 2:00 PM
How to Join: Sign up on Eventbrite!

 


Logistics
Safety – We are HUGE on safety! There will be a safety talk at 10am on the day of the event. Please note that we require all participants to be present for the safety talk and wear closed toe shoes. Unfortunately, we cannot allow anyone to participate that does not wear closed toe shoes and/or attend the safety talk.

Food – Lunch will be provided for all volunteers.

Water – Drinking fountains are available a 5 minute walk down at the bottom end of the canyon (near the Rec Centre), but to save time, please bring a water bottle.

Tools – Tools and gloves will be provided by the San Francisco Recreation & Parks Dept, but feel free to bring your own work gloves if you prefer.

Bathrooms – A porta-potty will be provided by the San Francisco Recreation & Parks Dept near the project areas.  There are also bathrooms down at the Rec Centre; however, since it is currently under renovation, the bathrooms may not be open.

Clothing – Sturdy, closed toe shoes are mandatory.  The canyon can be foggy and windy in the summer months; a windproof jacket is recommended.

We greatly appreciate the support from Access Fund for this Adopt-A-Crag!

Did You Know…
The first dynamite factory in the United States (est. 1868) was based in Glen Canyon (then sparsely populated) right around the current location of the Rec Center.  It exploded in 1869, killing 2 workmen and leveling the facility. It was rebuilt out in what is now the Sunset District (that facility also exploded).

Some older folks remember rafting on Islais Creek (the creek in the bottom of the canyon) during winter and spring.  Apparently, changes in the size and drainage on O’Shaughnessy Blvd and Portola Avenue, as well as the build-out of Miraloma Park (1930s-1950s) and Diamond Heights (1960s) substantially reduced the amount of surface runoff reaching the creek, reducing it to the small (though pleasant!) trickle it is today.

The rock is radiolarian chert – a sedimentary rock composed from the compressed silica-rich casings of dead single-celled marine organisms.  While not rare worldwide, it rarely outcrops in a way that is good for climbing. Apart from a few outcrops further up the Marin and Sonoma coasts, there is very little other chert climbing in the world.

Indian/Mortar Rock – East Bay – Adopt-A-Crag – March 2017

The Bay Area Climbers Coalition would like to thank all the incredible volunteers, board members, and friends who came out to support our conservation work at Indian Rock/Mortar Rock in the Berkeley Hills on Sunday, March 26. We were excited to partner with the awesome City of Berkeley Parks and Recreation department in this community effort!  We would also like to thank Access Fund for supporting this event with a grant!

With a 50% chance of rain forecast, we saw a solid turnout of 16 volunteers. The weather turned in our favor: cool and dry – perfect for getting out the shovels, wheelbarrows, and pitchforks!
We accomplished quite a bit during this event, including the following:
– We spread 4 truckloads of woodchips in the Pit and main use areas at Indian Rock.
– We removed heaps of downed tree branches from the Pit.
– We cleaned the runoff from the wet winter and resurrected the lower brim of the path near the Pit to prevent future impact on the path.
– We cleaned and rejuvenated paths around Mortar Rock and Indian Rock.
– We had a ton of fun!
All photos are thanks to Paulina @ http://www.littlegrunts.com.
The event is the first of many to come over the coming months (we just confirmed Glen Canyon in SF on May 13)! Keep an eye out for updates and upcoming opportunities to be involved soon.

Indian + Mortar Rock Adopt-A-Crag: Coming up March 26, 2017!

Join the Bay Area Climbers Coalition for conservation work at Indian and Mortar Rock in the Berkeley Hills.  Activities will include adding new wood chips to the Pit, graffiti and trash removal as well as other efforts to improve one of our busiest and most treasured local crags. This is a great opportunity to give back to some of the East Bay’s finest bouldering! Bring your crash pads for some post-cleanup climbing.

Location:  Indian Rock is located up in the Berkeley Hills. The Mountain Project website provides a great overview and directions. Carpooling is a great option since parking is limited, please be respectful of neighbor’s driveways.
Date:  Sunday, March 26, 2017
Time:  10:00 AM to 1:00 PM
How to Join:  Sign Up via Eventbrite

Safety – We are HUGE on safety! There will be a safety talk at 10am on the day of the event. Please note that we require all participants to be present for the safety talk and wear closed toe shoes. Unfortunately, we cannot allow anyone to participate that does not wear closed toe shoes and/or attend the safety talk.
Food – Lunch will be provided for all volunteers.
Water
– There are drinking fountains available at Indian Rock – please be sure to bring a water bottle.
Tools
– We will be getting tools and gloves from the City of Berkeley Parks department.
Bathrooms – There are no bathrooms at Indian or Mortar Rock; please plan accordingly. There will be a lunch break, and there are bathrooms available at nearby businesses and at Cragmont Rock Park.

Indian Rock – South Bay – Adopt-A-Crag – May 2016

On May 22, 45 volunteers from all around the Bay Area worked in 4 teams to complete several projects at Indian Rock in the South Bay. This event, in partnership with the Santa Clara County Parks, is an important step in ensuring we help take care of our beloved South Bay climbing areas.

Below is just a small snapshot of the hard work completed by our crew:
1 – Improved 2 approach trails and closed 3 social trails
2- Rebuilt log fence and tamped trail
3- Collected over 5 trash bags of glass and trash
4- Cleaned graffiti off of 9 key areas
5- Built 5 rock stairs on trail to lower tier of Indian Rock

Thank you to the many volunteers that came out to support this project as well as Boulder Creek Pizza for providing those hungry volunteers with lunch!

Castle Rock State Park Adopt-A-Crag – April 2016

Our first ever Adopt-A-Crag at Castle Rock State Park was a huge success with over 40 volunteers that showed up to take on a number of stewardship projects throughout the park.  We are so excited to be working with the amazing staff that oversees Castle Rock State Park to build programming to better engage the climbing community around stewardship at Castle Rock.

This event is the first of many to come and we hope that you will join us for future events at Castle Rock and other crags throughout the Bay Area.

Our organization’s goal, as always, is to ensure long-term access to our local climbing areas through the building of relationships with land managers, educating the climbing community, and by hosting stewardship events to care for the areas we recreate.

What work did the 40+ volunteers complete during this event?

  • We repaired and rebuilt four split rail fences throughout the park
  • We installed four new sign posts throughout the park
  • We removed over 50 pounds of glass and trash from the greater Goat Rock area
  • We removed graffiti from a number of caves around the Goat Rock area
  • We also closed two social trails that were causing erosion to hillsides

baccCastleRock-64122
photo credit: www.andrealaue.com — Instagram — @andrealaue

IMG_0027

IMG_0020

IMG_0009

13106092_10157163179275221_1570180507_o (1)

13091866_10157163178805221_801399975_o (1)

13078364_10157163178725221_1198776735_o (1)

13073024_10157163178315221_1914125042_o (1)
baccCastleRock-64340
photo credit: www.andrealaue.com — Instagram — @andrealaue

baccCastleRock-64314
photo credit: www.andrealaue.com — Instagram — @andrealaue

baccCastleRock-64247
photo credit: www.andrealaue.com — Instagram — @andrealaue

baccCastleRock-64226
photo credit: www.andrealaue.com — Instagram — @andrealaue

baccCastleRock-64203
photo credit: www.andrealaue.com — Instagram — @andrealaue

baccCastleRock-64184
photo credit: www.andrealaue.com — Instagram — @andrealaue

baccCastleRock-64161
photo credit: www.andrealaue.com — Instagram — @andrealaue

 

Mount Tamalpais Adopt-A-Crag 2016 Event Report

Last February, we partnered with One Tam to host a Mount Tamalpais Adopt-A-Crag event, and it was a total success! Under sunny skies, over 30 volunteers showed up to clean up glass and trash, close social trails, and improve the hiking trails that lead to some great climbing areas. The volunteers showed up early and got a ton of work done!

Huge “thanks” to Touchstone Climbing and Planet Granite for hooking up the raffle prizes for the event. We also want to thank High Tech Burrito for providing a great non-profit discount on a pile of tasty burritos to feed all of our hardworking volunteers. And another thank you shout out to our volunteer team leaders and to Francois Lebeau for taking photos of the gorgeous scenery, all of our awesome volunteers, and documenting all that hard work.

Here is a quick list of the work that we got done at these amazing local climbing spots.

East Peak:

– picked up over 50 pounds of glass and trash

– cleared overgrown branches from 300 feet of trails around the climbing area

– closed 5 social trails

– cleared rubble and loose rocks from over 4000 feet of trail

– cleared debris out of 16 water bars to allow water to easily shed off the trails

– removed 16 dead tree stumps from the trail

Lakeview Boulders:

– built 2 check steps where erosion was occurring on the approach trail

– cleared the approach of debris and leaves

– cleared overgrown branches from 150 feet of trails around the climbing area

 

Thank you again to everyone that came out to put some love into our local crags!

group_forreals

william

weaver_rock_bar

trash_east_peak

trash_cleanup

tam_view

rocky_smile

rock_sling

rock_moving

rock_moving_weavers_arm

raffle

one_tam_folks

matt_safety_talk

matt_ally

matt_ally_safety_talk

macleod

lunch

lakeview_meeting

lakeview_group_approach

juliane

harlow

glass_cleanup

dar_table

casey_fridge

casey_approach

ally_pruning

Indian + Mortar Rock Adopt-A-Crag 2015 Event Report

Two of our amazing board members – Ally and Caden – got the chance to run their very first Adopt-A-Crag event at Indian and Mortar Rock and it was a huge success. Over 30 volunteers showed up to take on some needed work at Indian and Mortar Rock last Sunday. These volunteers worked crazy hard and got a huge amount of work done in a very short time!

Huge “thanks” to Planet Granite, Touchstone Climbing, and CLIF Bar for hooking up the raffle prizes for the event.  We also want to thank Rotten City Pizza for donating a number of their tasty pies to feed the hardworking volunteers.

Here is a quick list of the work that we got done at these amazing local climbing spots.

Indian Rock:
– picked up tons of glass and trash – easily 60 pounds
– installed new wood chips in The Pit, up top near The Ape, and along the start of the Indian Rock Traverse – 10 cubic yards in total!
– cleared dirt and pulled weeds from the main stairs leading down to The Pit
– swept all the pathways around the park – the neighbors love this

Mortar Rock:
– picked up trash from around the park
– cleared the stairs around the back side of debris and leaves
– installed some new rocks along the pathways to better define and discourage cutting through the planted areas

Thank you again to everyone that came out to put some love into our local crags!

 

 

2015 Fall Highball – Sads Trail Work

The American Alpine Club hosts a number of Craggin’ Classic events across the country. These events focus on bringing the climbing community together and they always build in a stewardship project – all things we are totally in love with!

The Fall Highball in Bishop is a great event and excuse to get some Eastern Sierras crushing in while also making some time to help out with stewardship projects at the Buttermilks, The Happys, and The Sads. These climbing areas are very popular and get a lot of traffic during a very short season so the more that the climbing community can do to support and maintain these areas, the better.

Three of our board members – Allyson, Caden, and Matt – all made it out to this event and did some great work on the approach trail to The Sads.

The trail from the Chalk Bluff Road side of The Sads ascends a fairly steep hill and with all the traffic this trail sees it is in fairly good condition. Our team lead a smaller team of volunteers to make some improvements to this trail. With only 3 hours of work and 8 total volunteers, we were able to get a lot of work done.

Ally did some amazing work higher up on the trail where some of the existing stairs had come loose and were being washed out from heavy traffic. Stairs were fixed and cleared off to help better define the correct trail to use.

Caden and Matt added an extra stone stair about 1/4 of the way up – there was a big gap between the existing stairs and the outside edge of the trail was blowing out from folks walking on the outside edge. They also added some rocks on the edge of the trail to provide a visual marker for folks.

2015-11-08 10.59.47

2015-11-08 11.00.31

 

IMG_2780

We also had some help from local crusher – PAULA!!!!!
2015-11-08 11.01.04-2

There was also another area where folks were side-stepping the stone stairs. This side-stepping was causing the outside edge of the trail to blow out and knocking rocks down the hillside. To stop the erosion issues and keep folks on the correct part of the trail we added a rubble wall.  Here is the before photo:

IMG_2778

Here is the after photo – note the wall on the left side of the trail and the better defined stairs.

IMG_2779